Seminar Nr. 16814
Dieses Seminar hat leider schon statt gefunden. Wenn Sie aber Interesse an diesem Seminar haben, informieren wir Sie gerne über den neuen Termin oder über weitere Angebote zu dem Thema. Nutzen Sie einfach das folgende Kontaktformular, um uns Ihre Anfrage zu senden.
Rückfragen unter:
Tel.: 06221 / 84 44 0 E-Mail: info@concept-heidelberg.de
When a technical project is launched, it is often not yet clear which GMP requirements exist to what extend. Even though the process know-how lies with the pharmaceutical manufacturer, they usually expect a GMP-compliant system from the equipment manufacturer and reference regulations from the world of EU and FDA guidelines. In addition, compliance to many internal SOPs is also demanded. That makes it difficult, if not impossible, for equipment manufacturers to build and deliver products in compliance with all these vague requirements. At this point, user requirement specifications (URS) and risk analyses come into play. A risk analysis helps with determining which aspects are relevant for the quality and therefore subject to the mandatory qualification. These are summarised in the URS and submitted to the equipment manufacturer – or vice versa? This means to invite offers based on the URS and perform a risk analysis together with the equipment or system supplier later. After the change in EU regulations (EU GMP Annex 15), both documents will definitely be part of the qualification. The URS will then not be limited to procurement anymore; instead, it will be a living document within the system lifecycle – an approach which has been adopted from computer system validation. Besides the specification of the scope of delivery, the approach also describes further requirements to be met during the system lifecycle and thereby the test specifications for qualification and validation.
Target audience of this webinar are suppliers of equipment which has to comply with the requirements of the pharmaceutical user. But also pharmaceutical users (that are engineers and e.g. the head of production) who have to define these requirements.
For our webinars, we use Cisco WebEx, one of the leading suppliers of online meetings. At http://www.webex.com/test-meeting.htm you can check if your system meets the necessary requirements for the participation at a WebEx meeting and at the same time install the necessary plug-in. Please just enter your name and email address for the test. If the installation is not possible because of your rights for the computer system, please contact your IT department. WebEx is a standard nowadays and the necessary installation is fast and easy.
This webinar shows how requirements can be laid down between the pharmaceutical client and the technical supplier in technical projects. Assistance in preparing URS and risk analyses will enable the development of a structured and comprehensible qualification process.